Construction of new mixed use premises destroyed by the Omagh Bomb.
| Client: | Elizabeth McElroy |
| Architect: | Davy Chism |
| G& P Building Designs | |
| 2 Bridge St | |
| Omagh | |
| +44 (0)28 8224 6182 | |
| Contract Value: | £0.65M |
| Contract Duration: | Mar 06 – Nov 06 |
| Brief Description: | This project involved the demolition of an existing derelict building and the construction of a new 3 storey building on the in-fill site. Temporary works to waterproof and stabilise the adjoining properties were required during the demolition and initial construction stages. The new building was constructed on a piled floor and provided ground floor retail with residential units on the 1st and 2nd floor. |