Waste water Treatment Works

Waste water Treatment Works , Drumaness, Co. Down

New Waste Water Treatment Works constructed on an existing site including network alterations.

Client:NI Water (Michael Donnelly)
Consultants:NI Water
 34 College Street
 Belfast
 +44 (0)28 9032 8161 (Emma McCracken)
Contract Value:£1.4M
Contract Duration:Apr 04 – 1st Jun 05
Brief Description:

Provision of

  • replacement inlet pumping station and valve chamber;
  • inlet-works;
  • storm-water storage capacity;
  • concrete tanks to accommodate membrane bio-reactors (MBR), sludge holding and thickening plant;
  • permeate sample chamber;
  • permeate pumping station;
  • 1700m of pumping main;
  • main control building;
  • stand-by generation, control panel and MBR air-blowers;
  • all required instrumentation, and control systems;
  • earth embankments and landscaping; roadworks and footpaths;
  • on-site interconecting pipework;
  • perimeter planting replacement;
  • demolition of existing structures;
  • flow diversion works;
  • Commission works.