New MBR treatment works constructed on existing sites whilst maintaining operation of the existing works.
| Client: | NI Water (Kieran Grant) |
| Consultants: | McAuley & Browne |
| 250 Ravenhill Rd | |
| Belfast | |
| BT6 8GJ | |
| +44 (0)28 9046 6199 (Ian Tumilson) | |
| Contract Value: | £1.2M |
| Contract Duration: | Aug 04 – 1st Aug 05 |
| Brief Description: | Construction of a new MBR treatment works on the site of the existing works which had to be kept operational at all times. |
| Key elements being; | |
| New MBR tanks | |
| New storm tanks | |
| New Inlet works | |
| New control building | |
| New 400dia outfall (installed under a main railway line utilising pipe-jacking techniques) | |
| Associated pipelines and site works. |