Construction of warehouse (6,180m2)and associated works for a Recycling facility.
| Client: | Natural World Products (NWP) |
| Design Consultant Engineers: | Mott Mac Donald |
| Contract Value: | £2.6m |
| Contract Duration: | 40 wks |
| Brief description: | The works involve the construction of a warehouse (6,180m2) with reinforced concrete bases, walls and tunnels. The warehouse will be built using a structural steel frame and finished with the cladding of the walls and roof. |